Archive for the ‘Construction’ Category

Minimize Construction Management Conflicts

This item was filled under [ Construction ]

All Construction projects will have conflicts develop, while most are minor and easily resolved there will be the occasional major issue that redirects the attention of everyone involved and creates animosity. However, through the development of owner specifications, review of details which have a history of being deficient, schedule monitoring, and project documentation, these situations can minimized.

Some construction management firms claim all construction conflicts can be eliminated and avoided during the pre-design phase. However, even if all the details are correct, and specifications are absolutely clear, the contractor still has to build the project per plans and specifications.

In today?s construction market, most project managers and superintendents are on a bonus program and will attempt to install inferior materials and cut corners on details to expedite the project and reduce cost. In these situations, the owner must be prepared with complete project documentation to reduce its exposure. Architectural firms can only offer the owner a limited amount of protection due to the AIA guidelines and their liability associated with the design.

VN:F [1.9.17_1161]
Rating: 4.5/5 (2 votes cast)

Continue reading...

HVAC Preventive Maintenance

This item was filled under [ Construction ]

When you ask the average person to give a definition of preventive maintenance, most will respond with regular oil changes of a vehicle and describe the other things they check on a monthly basis. Surprisingly, when you ask someone who is a facility manager the same question, more often than not, you will receive a similar answer of changing filters in HVAC equipment, lubricating pumps, motors, cleaning, and inspecting equipment.

Although the above is a description of the work associated with preventive maintenance, it is not the definition. The definition of preventive maintenance, as it relates to a building or structure is “The systematic attention and analysis applied in equal and economic amounts to retard the rate of deterioration and to insure proper functioning of physical facilities.”

A properly set-up preventive maintenance program will significantly reduce the rate of deterioration of the total system envelope, will extend the life expectancy of equipment, and reduce utility costs. 

However, where most preventive maintenance programs fall short, is the person only focuses on building equipment, and does not include roof curb maintenance and inspections, ductwork inspections, inspect exterior insulation for signs of deterioration or moisture infiltration, or the air distribution.

The average facility also does not complete 100% of the scheduled monthly PMs, because of perceived other pressing issues. This can be resolved by reviewing how a preventive maintenance program is administered. For example; a mechanic is performing a monthly PM on an air handling unit, and during the PM he discovers a fan bearing making noise, so the bearing is replaced, and two hours later the PM card is signed off on. This method of performing a preventive maintenance program significantly increases the program cost.

A well implemented preventive maintenance program consists of Adjustment, Testing, Cleaning, and Inspection. Should a mechanic discover repairs beyond these four items, the work must be performed under a regular or normal work orders versus under a PM work order. Even though the mechanic performs the work in conjunction with the PM work order, the PM for the piece of equipment should be completed, and the corrective repairs noted on a maintenance work order.

A facility manager must commit to the preventive maintenance program to ensure its success. Be prepared to listen to every excuse for not completing the monthly PMs, however, through diligence and patience after approximately ninety days, you will begin to notice a reduced amount of
mechanical failures. During this time, the facility manager can begin to take on those special projects that have been put on hold due to not having the time, and will hit a home run every time with Administration.

VN:F [1.9.17_1161]
Rating: 5.0/5 (1 vote cast)

Continue reading...